Asumher

Início da página web

Contenido

Proyectos realizados
BOREA PARK (Castellón)

Due to the proximity of the train tunnels foundation and to ensure comfort in the building, was proposed and installed of SEB, located in the base of the building thereby interrupting the transmission of noise and vibrations through the structure.


 
 
Imagen de producto
     
Imagen de producto
Imagen de producto
Imagen de producto
Imagen de producto
     
     
VOLVER A LISTADO
     
 

Pie de página